Clause 55 · Residential development · Victoria

Plan the buildings and the trees together.

Tree evidence for better residential design.

For proposals involving two or more dwellings, early arboricultural advice can show what should be retained, where development may affect trees, and how new canopy can grow. The Suburban Arborist helps turn those findings into a clear input for the design and planning team.

Mature eucalyptus beside a residential building
Photography: Nenyasha Manzvera / Unsplash

The planning context

Where Clause 55 begins.

Clause 55 sets objectives and standards for specified applications for two or more dwellings on a lot and residential buildings of three storeys or less. It applies in the Mixed Use, Township, Residential Growth, General Residential, Neighbourhood Residential, and Housing Choice and Transport zones.

A development must meet all applicable objectives. Meeting a standard means its corresponding objective is deemed met; if a standard is not met, Council considers the relevant decision guidelines. A zone or overlay schedule may change a standard, so the property controls and proposal need to be checked.

Clause 55 covers much more than trees. This page focuses on the site information, design choices and canopy standard where arboricultural advice can help.

Clause 55.01 · Before the design is fixed

Describe the site. Respond to what is there.

The designer or planner prepares the overall Clause 55 response. Tree evidence helps them show how the development responds to existing vegetation, street trees and future planting space.

01 / Site description

Record existing trees

Clause 55.01-1 asks for trees on the site at least 5 metres high with trunk circumference at least 0.5 metres, measured 1.4 metres above ground. The site description also records street frontage features, including street trees, services and crossovers.

This site-description threshold differs from the definition used to count an existing canopy tree under Standard B2-7.

02 / Design response

Show the landscape strategy

Clause 55.01-2 calls for a landscape plan that details retained and proposed canopy trees; other planting and its species, number and mature size; deep soil and root barriers where required; irrigation and suitable species selection.

The application also needs a written statement addressing applicable standards and, where a standard is not met, the corresponding objective and decision guidelines.

Layout decisions

Tree outcomes begin on the drawing board.

Building placement, access and site coverage can leave a tree room to thrive—or make retention difficult. Clause 55 decision guidelines bring canopy retention and planting into those design choices.

55.02-1

Street setback

Consider whether a different setback affects the ability to retain or plant canopy trees.

55.02-3

Side & rear setbacks

Test the rear building envelope against retained trees and space for new canopy.

55.02-5

Site coverage

Consider how building coverage affects tree retention and planting opportunities.

55.02-6

Access

A crossover or accessway must not encroach more than 10% into the tree protection zone of a retained road tree.

Standard B2-7 · Tree canopy

Know the canopy that counts.

Standard B2-7 seeks to preserve existing canopy and provide new canopy for amenity, biodiversity and a cooler urban environment.

Existing canopy tree

At least 5 metres high, with an average canopy diameter of at least 4 metres, and a trunk at least 4 metres from existing and proposed buildings.

New canopy tree

Expected to reach at least 6 metres high and 4 metres in canopy diameter at maturity.

The average canopy diameter is measured from two perpendicular lines across the widest points of the drip line. A tree that cannot be counted under B2-7 may still need assessment or protection under other controls.

Table B2-7.1 · Canopy cover
Site areaMinimum canopy cover
1,000 m² or less10% of site area
More than 1,000 m² to 1,500 m²15% of site area
More than 1,500 m²20% of site area
Example / 1,200 m² site

The 15% target is 180 m² of canopy cover. Retained and proposed trees can contribute, subject to the standard’s counting rules.

How canopy is counted

  • Retained existing trees, new canopy trees, or a combination of both can provide the total.
  • The full canopy of an existing tree counts even if part extends beyond the site.
  • New-tree canopy within the site and overhanging a public road or open space counts.
  • Canopy over or under buildings counts; overlapping canopy is counted once.
  • At least one canopy tree is in the front setback, unless one retained tree elsewhere meets the target on its own.

Related, but separate: Clause 52.37 has its own canopy-tree permit pathway and a different existing-tree definition. Its additional formula for sites above 1,500 m² with existing canopy over 20% does not appear in Standard B2-7. Explore Clause 52.37

Illustrative design coordination

See the constraints together.

The example places two adjoining dwellings around a shared driveway, with separate rear decks and trees in both the front and rear setbacks. For an illustrative 1,200 m² site, 84 m² of retained canopy plus three new trees at about 36 m² each gives 192 m² of cover, above the 180 m² B2-7 target. Each new tree is shown with 25 m² of deep soil for an expected mature canopy diameter between 6 and 7 metres. The final plan must follow the actual site survey and design.

Illustrative plan of two adjoining dwellings and central shared driveway, with separate rear decks, dividing fence, one retained rear tree, three proposed front and rear trees, deep soil areas and a worked canopy calculation
Illustrative concept only · not to scale or an application drawing.

Standard B2-7 · Table B2-7.2

Leave enough space below the canopy.

Each new canopy tree needs deep soil or a planter sized for its expected mature canopy diameter. These are the minimum dimensions in the current standard.

Table B2-7.2 · Deep soil and planter requirements
Expected mature canopy diameterMinimum deep soil areaPlanter soil volumePlanter soil depthMinimum plan dimension
4 m to less than 5 m12 m²8 m³0.8 m2.5 m
5 m to less than 6 m16 m²12 m³0.8 m3 m
6 m to less than 7 m25 m²17 m³0.8 m3.5 m
7 m to less than 8 m36 m²23 m³0.8 m4 m
8 m to less than 9 m49 m²30 m³1.0 m4.5 m
9 m to less than 10 m64 m²38 m³1.0 m5 m
10 m to less than 11 m81 m²47 m³1.0 m5.5 m
11 m to less than 12 m100 m²57 m³1.0 m6 m
12 m to less than 13 m121 m²68 m³1.5 m6.5 m
13 m to less than 14 m136 m²80 m³1.5 m7 m
14 m or greater144 m²92 m³1.5 m7.5 m

Shared deep soil

Table B2-7.3 allows the required area to be reduced when new trees share one deep soil space: 5% for two trees, 10% for three, 15% for four, 20% for five and 25% for six or more.

Limited encroachment

The standard permits up to 10% impervious surface, up to 50% unroofed decking with compliant board gaps, and eaves extending no more than 600 mm into deep soil. The location and viability of the planting space still matter.

How The Suburban Arborist can assist

Good tree information, at the right stage.

I provide independent tree evidence for designers, planners and property owners. The work can be scoped to the development stage and the decisions the team needs to make.

01 / Early layout

Tree survey & preliminary report

Identify site and street trees, record condition and dimensions, and map retention values and indicative root constraints before footprints and access are fixed.

Preliminary reports ↗
02 / Developed plans

Impact assessment

Review proposed buildings and works around retained trees, including their relationship with tree protection zones and feasible design responses.

Impact assessments ↗
03 / Construction

Tree protection

Prepare Tree Protection Specifications and a Tree Protection Plan for practical measures during site works, aligned with AS 4970:2025.

Protection plans ↗
04 / Canopy strategy

Calculations & planting input

Calculate existing and proposed canopy, identify qualifying retained trees, and advise on new locations and suitable genera and species. A planting plan can be arranged as a separate scope.

Where condition or risk needs separate evidence, a Tree Health & Condition Report or VALID Tree Risk-Benefit Assessment can be scoped for that question.

Common questions

Before the plans are settled.

When should an arborist join the project?

Before the first layout is fixed, especially where mature trees, a constrained lot or street trees could affect buildings or access.

Can a retained tree count towards the canopy target?

Yes, if it meets Standard B2-7’s height, canopy diameter and 4 metre building-distance tests. Its contribution is then calculated under the canopy counting rules.

Is Clause 55 the same as Clause 52.37?

No. Clause 55 assesses specified residential development applications. Clause 52.37 has a separate canopy-tree permit pathway and canopy-cover provisions. Both may need checking for a project.

Does the arborist prepare the entire Clause 55 response?

I prepare tree-related evidence and recommendations. The designer or planner coordinates the full development proposal and standards statement.

Check the current provision

Figures on this page reflect the Victoria Planning Provisions as reviewed for this draft. A property’s zone schedule, overlays and application date may affect its requirements. View Clause 55 ↗ View Clause 55.02 ↗

Start with the site

Discuss your development and the trees.

Send the property address, proposed dwelling number, design stage and any available survey or plans. I can help identify the tree evidence and scope needed for the next decision.

[email protected]0401 766 127

Consulting across Melbourne & Victoria
Subject to service-area eligibility.

Service area note: Consulting work cannot currently be accepted for properties within Maroondah municipality due to a professional conflict-of-interest requirement.

Clause 55 enquiry

Tell me about your project.

Share the essentials below. Your email app will open a draft where you can add photos or documents before sending.